SMT assembly and board bring-up
Assembly turns a bare board into a circuit. We align the bill of materials, placement data and first power-up procedure before work begins.

BOM and placement data
The BOM identifies exact components; the placement file defines positions and orientation. References are checked against the design, and substitutes require approval.
Component sourcing and assembly
Sourcing and assembly follow the agreed board revision. Package details, polarity and first-board inspection receive particular attention.
Bring-up and functional testing
We begin with power rails and basic functions. Firmware loading, interface checks and measurement records are defined around your circuit and the agreed scope.
Continue your project
Frequently asked questions
What files should I send?
Include Gerber files, BOM, placement data and an assembly drawing, plus the board revision, quantity and intended tests.
Can I supply components?
We review the list and condition first, then resolve missing or uncertain items before assembly.
Tell us about your electronics project
Send the available files, required functions and quantity. We will clarify the scope before preparing a proposal.
Bring-up and testing
Checks
- Power supply
- Signals
- Function
Illustration of the testing process.